With a combined monthly production capability of up to 80,000 pieces of ducting, we are able to meet even the most demanding schedule
Master Ducts it’s mainly used as the prestressed concrete structure and post-tensioning system, such as the large span railway and highway, bridges, crane girders, rock-soil anchoring engineering, multi-floor industrial plant, precast concrete products, etc.